Crane on a modern construction site
Site Riverside Plot 4Stage Design DevelopmentWeather Clear, 21°CIssued 14.07.2026

Every pound on site,
measured before it's poured.

Hill Cost Consultant is a chartered quantity surveying consultancy. We cost, tender and control construction budgets from first sketch to final account, so the number you approve is the number you pay.

RICS-regulated · Instructed on projects from £2m to £180m GDV
Scroll
↓
“A cost plan is only as good as the measurement behind it. We do our measurements twice. First on the drawing, and then against the market.”
Founding Director, Hill Cost Consultant

£1.4B+

Assets Audited

98%

Projects On-Budget

25+

Years Combined Exp.

RICS

Regulated Chartered QS

Recent Projects

A small selection of projects where the final account matched the cost plan — or beat it.

Residential tower under construction with crane
Residential · London

Riverside Residential Tower

214 units, delivered 6.1% under the initial cost plan through phased value engineering.

Contract sum£47.2m
Large commercial construction site with cranes
Industrial & Logistics

Northgate Distribution Hub

38,000 m² warehouse; tender secured 4.2% below budget across three bidding contractors.

Contract sum£31.6m
Mixed-use building under construction street level
Healthcare

Elmside Community Hospital Refurbishment

Final account agreed within 1.1% of the original contract sum despite live-site working.

Contract sum£18.9m

Expertise

Fiscal discipline at every build phase

Pre-Contract Estimation

Feasibility studies, rigorous bills of quantities (BOQ), and value engineering to anchor budgets before breaking ground.

Contract Administration

Procurement strategy, JCT/NEC contract drafting, change-order evaluations, and robust risk management structures.

Post-Contract Cost Control

Interim valuations, progress tracking, dynamic cash flow forecasting, and smooth final account settlements.

Start a brief

Tell us what you're building and roughly what it should cost. We'll come back with how we'd cost-plan it, and a realistic timeline for a first estimate.

  • Order-of-cost estimate within 5 working days
  • No obligation, no templated report
  • Direct line to the surveyor on your account